21 May, 2019

The modernization program is to be carried out before 2020.

DrilLife CS will obtain new cement trucks; renovated drilling rigs will be provided for DrilLife DS; DrilLife GS will purchase advanced Seismotektonike. The equipment of the latest generation will allow to enhance the work capacity. By the end of 2020 all the equipment will have been renovated.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.